OpenAI–SoftBank: $1bn for 1.2 GW Texas AI Data Centre

OpenAI–SoftBank: $1bn for 1.2 GW Texas AI Data Centre

OpenAI

2 ene 2026

The image depicts a vast industrial facility nestled in a wide, open rural landscape under a clear, blue sky, showcasing a sprawling warehouse complex surrounded by patches of vegetation and a distant horizon, highlighting the infrastructure of modern business ventures like OpenAI and SoftBank.
The image depicts a vast industrial facility nestled in a wide, open rural landscape under a clear, blue sky, showcasing a sprawling warehouse complex surrounded by patches of vegetation and a distant horizon, highlighting the infrastructure of modern business ventures like OpenAI and SoftBank.

OpenAI and SoftBank Group have entered a strategic partnership with SB Energy to build and operate next-generation AI data-centre campuses as part of Stargate. Each company will invest $500m (total $1bn) into SB Energy, which has been selected to deliver OpenAI’s 1.2 GW site in Milam County, Texas.

Key points

  • Scale for AI growth: Multi-gigawatt campuses purpose-built for AI training and inference under the Stargate programme.

  • $1bn equity commitment: $500m each from OpenAI and SoftBank to accelerate SB Energy’s build-out.

  • Texas flagship (1.2 GW): SB Energy to build and operate OpenAI’s Milam County facility.

What’s new or how it works

The parties formed a preferred (non-exclusive) partnership model: OpenAI provides first-party data-centre design; SB Energy brings speed, cost discipline, and integrated energy delivery to stand up large, optimised AI campuses. This approach underpins Stargate’s rapid U.S. build-out.

Practical steps

For organisations planning AI infrastructure or major AI workloads:

  1. Capacity planning: Map model/training roadmaps to MW/GW demand and site phasing; consider U.S. options for near-term capacity.

  2. Energy strategy: Evaluate grid interconnect timelines vs. integrated energy/microgrid options seen in recent U.S. AI builds.

  3. Vendor alignment: Separate facility developer/operator (e.g., SB Energy-style role) from compute stack decisions for speed and resilience.

FAQs

Q1: What is the main goal of the partnership?
To accelerate multi-gigawatt AI data-centre campuses and associated energy infrastructure for Stargate.

Q2: Where is the first major site?
Milam County, Texas (1.2 GW), to be built and operated by SB Energy for OpenAI.

Q3: How does this support Stargate?
It provides a repeatable build model—OpenAI design + SB Energy delivery—to scale U.S. AI compute quickly, with energy integrated from day one.

Summary

OpenAI and SoftBank’s $1bn commitment to SB Energy—including a 1.2 GW Texas site—marks a step-change in AI infrastructure capacity and speed under Stargate. Speak to Generation Digital to align your AI roadmap with infrastructure, energy and governance decisions.

OpenAI and SoftBank Group have entered a strategic partnership with SB Energy to build and operate next-generation AI data-centre campuses as part of Stargate. Each company will invest $500m (total $1bn) into SB Energy, which has been selected to deliver OpenAI’s 1.2 GW site in Milam County, Texas.

Key points

  • Scale for AI growth: Multi-gigawatt campuses purpose-built for AI training and inference under the Stargate programme.

  • $1bn equity commitment: $500m each from OpenAI and SoftBank to accelerate SB Energy’s build-out.

  • Texas flagship (1.2 GW): SB Energy to build and operate OpenAI’s Milam County facility.

What’s new or how it works

The parties formed a preferred (non-exclusive) partnership model: OpenAI provides first-party data-centre design; SB Energy brings speed, cost discipline, and integrated energy delivery to stand up large, optimised AI campuses. This approach underpins Stargate’s rapid U.S. build-out.

Practical steps

For organisations planning AI infrastructure or major AI workloads:

  1. Capacity planning: Map model/training roadmaps to MW/GW demand and site phasing; consider U.S. options for near-term capacity.

  2. Energy strategy: Evaluate grid interconnect timelines vs. integrated energy/microgrid options seen in recent U.S. AI builds.

  3. Vendor alignment: Separate facility developer/operator (e.g., SB Energy-style role) from compute stack decisions for speed and resilience.

FAQs

Q1: What is the main goal of the partnership?
To accelerate multi-gigawatt AI data-centre campuses and associated energy infrastructure for Stargate.

Q2: Where is the first major site?
Milam County, Texas (1.2 GW), to be built and operated by SB Energy for OpenAI.

Q3: How does this support Stargate?
It provides a repeatable build model—OpenAI design + SB Energy delivery—to scale U.S. AI compute quickly, with energy integrated from day one.

Summary

OpenAI and SoftBank’s $1bn commitment to SB Energy—including a 1.2 GW Texas site—marks a step-change in AI infrastructure capacity and speed under Stargate. Speak to Generation Digital to align your AI roadmap with infrastructure, energy and governance decisions.

Recibe consejos prácticos directamente en tu bandeja de entrada

Al suscribirte, das tu consentimiento para que Generation Digital almacene y procese tus datos de acuerdo con nuestra política de privacidad. Puedes leer la política completa en gend.co/privacy.

¿Listo para obtener el apoyo que su organización necesita para usar la IA con éxito?

Miro Solutions Partner
Asana Platinum Solutions Partner
Notion Platinum Solutions Partner
Glean Certified Partner

¿Listo para obtener el apoyo que su organización necesita para usar la IA con éxito?

Miro Solutions Partner
Asana Platinum Solutions Partner
Notion Platinum Solutions Partner
Glean Certified Partner

Generación
Digital

Oficina en el Reino Unido
33 Queen St,
Londres
EC4R 1AP
Reino Unido

Oficina en Canadá
1 University Ave,
Toronto,
ON M5J 1T1,
Canadá

Oficina NAMER
77 Sands St,
Brooklyn,
NY 11201,
Estados Unidos

Oficina EMEA
Calle Charlemont, Saint Kevin's, Dublín,
D02 VN88,
Irlanda

Oficina en Medio Oriente
6994 Alsharq 3890,
An Narjis,
Riyadh 13343,
Arabia Saudita

UK Fast Growth Index UBS Logo
Financial Times FT 1000 Logo
Febe Growth 100 Logo (Background Removed)

Número de la empresa: 256 9431 77 | Derechos de autor 2026 | Términos y Condiciones | Política de Privacidad

Generación
Digital

Oficina en el Reino Unido
33 Queen St,
Londres
EC4R 1AP
Reino Unido

Oficina en Canadá
1 University Ave,
Toronto,
ON M5J 1T1,
Canadá

Oficina NAMER
77 Sands St,
Brooklyn,
NY 11201,
Estados Unidos

Oficina EMEA
Calle Charlemont, Saint Kevin's, Dublín,
D02 VN88,
Irlanda

Oficina en Medio Oriente
6994 Alsharq 3890,
An Narjis,
Riyadh 13343,
Arabia Saudita

UK Fast Growth Index UBS Logo
Financial Times FT 1000 Logo
Febe Growth 100 Logo (Background Removed)


Número de Empresa: 256 9431 77
Términos y Condiciones
Política de Privacidad
Derechos de Autor 2026