OpenAI–SoftBank: $1bn for 1.2 GW Texas AI Data Centre

OpenAI–SoftBank: $1bn for 1.2 GW Texas AI Data Centre

OpenAI

2 janv. 2026

The image depicts a vast industrial facility nestled in a wide, open rural landscape under a clear, blue sky, showcasing a sprawling warehouse complex surrounded by patches of vegetation and a distant horizon, highlighting the infrastructure of modern business ventures like OpenAI and SoftBank.
The image depicts a vast industrial facility nestled in a wide, open rural landscape under a clear, blue sky, showcasing a sprawling warehouse complex surrounded by patches of vegetation and a distant horizon, highlighting the infrastructure of modern business ventures like OpenAI and SoftBank.

OpenAI and SoftBank Group have entered a strategic partnership with SB Energy to build and operate next-generation AI data-centre campuses as part of Stargate. Each company will invest $500m (total $1bn) into SB Energy, which has been selected to deliver OpenAI’s 1.2 GW site in Milam County, Texas.

Key points

  • Scale for AI growth: Multi-gigawatt campuses purpose-built for AI training and inference under the Stargate programme.

  • $1bn equity commitment: $500m each from OpenAI and SoftBank to accelerate SB Energy’s build-out.

  • Texas flagship (1.2 GW): SB Energy to build and operate OpenAI’s Milam County facility.

What’s new or how it works

The parties formed a preferred (non-exclusive) partnership model: OpenAI provides first-party data-centre design; SB Energy brings speed, cost discipline, and integrated energy delivery to stand up large, optimised AI campuses. This approach underpins Stargate’s rapid U.S. build-out.

Practical steps

For organisations planning AI infrastructure or major AI workloads:

  1. Capacity planning: Map model/training roadmaps to MW/GW demand and site phasing; consider U.S. options for near-term capacity.

  2. Energy strategy: Evaluate grid interconnect timelines vs. integrated energy/microgrid options seen in recent U.S. AI builds.

  3. Vendor alignment: Separate facility developer/operator (e.g., SB Energy-style role) from compute stack decisions for speed and resilience.

FAQs

Q1: What is the main goal of the partnership?
To accelerate multi-gigawatt AI data-centre campuses and associated energy infrastructure for Stargate.

Q2: Where is the first major site?
Milam County, Texas (1.2 GW), to be built and operated by SB Energy for OpenAI.

Q3: How does this support Stargate?
It provides a repeatable build model—OpenAI design + SB Energy delivery—to scale U.S. AI compute quickly, with energy integrated from day one.

Summary

OpenAI and SoftBank’s $1bn commitment to SB Energy—including a 1.2 GW Texas site—marks a step-change in AI infrastructure capacity and speed under Stargate. Speak to Generation Digital to align your AI roadmap with infrastructure, energy and governance decisions.

OpenAI and SoftBank Group have entered a strategic partnership with SB Energy to build and operate next-generation AI data-centre campuses as part of Stargate. Each company will invest $500m (total $1bn) into SB Energy, which has been selected to deliver OpenAI’s 1.2 GW site in Milam County, Texas.

Key points

  • Scale for AI growth: Multi-gigawatt campuses purpose-built for AI training and inference under the Stargate programme.

  • $1bn equity commitment: $500m each from OpenAI and SoftBank to accelerate SB Energy’s build-out.

  • Texas flagship (1.2 GW): SB Energy to build and operate OpenAI’s Milam County facility.

What’s new or how it works

The parties formed a preferred (non-exclusive) partnership model: OpenAI provides first-party data-centre design; SB Energy brings speed, cost discipline, and integrated energy delivery to stand up large, optimised AI campuses. This approach underpins Stargate’s rapid U.S. build-out.

Practical steps

For organisations planning AI infrastructure or major AI workloads:

  1. Capacity planning: Map model/training roadmaps to MW/GW demand and site phasing; consider U.S. options for near-term capacity.

  2. Energy strategy: Evaluate grid interconnect timelines vs. integrated energy/microgrid options seen in recent U.S. AI builds.

  3. Vendor alignment: Separate facility developer/operator (e.g., SB Energy-style role) from compute stack decisions for speed and resilience.

FAQs

Q1: What is the main goal of the partnership?
To accelerate multi-gigawatt AI data-centre campuses and associated energy infrastructure for Stargate.

Q2: Where is the first major site?
Milam County, Texas (1.2 GW), to be built and operated by SB Energy for OpenAI.

Q3: How does this support Stargate?
It provides a repeatable build model—OpenAI design + SB Energy delivery—to scale U.S. AI compute quickly, with energy integrated from day one.

Summary

OpenAI and SoftBank’s $1bn commitment to SB Energy—including a 1.2 GW Texas site—marks a step-change in AI infrastructure capacity and speed under Stargate. Speak to Generation Digital to align your AI roadmap with infrastructure, energy and governance decisions.

Recevez des conseils pratiques directement dans votre boîte de réception

En vous abonnant, vous consentez à ce que Génération Numérique stocke et traite vos informations conformément à notre politique de confidentialité. Vous pouvez lire la politique complète sur gend.co/privacy.

Prêt à obtenir le soutien dont votre organisation a besoin pour utiliser l'IA avec succès?

Miro Solutions Partner
Asana Platinum Solutions Partner
Notion Platinum Solutions Partner
Glean Certified Partner

Prêt à obtenir le soutien dont votre organisation a besoin pour utiliser l'IA avec succès ?

Miro Solutions Partner
Asana Platinum Solutions Partner
Notion Platinum Solutions Partner
Glean Certified Partner

Génération
Numérique

Bureau au Royaume-Uni
33 rue Queen,
Londres
EC4R 1AP
Royaume-Uni

Bureau au Canada
1 University Ave,
Toronto,
ON M5J 1T1,
Canada

Bureau NAMER
77 Sands St,
Brooklyn,
NY 11201,
États-Unis

Bureau EMEA
Rue Charlemont, Saint Kevin's, Dublin,
D02 VN88,
Irlande

Bureau du Moyen-Orient
6994 Alsharq 3890,
An Narjis,
Riyad 13343,
Arabie Saoudite

UK Fast Growth Index UBS Logo
Financial Times FT 1000 Logo
Febe Growth 100 Logo (Background Removed)

Numéro d'entreprise : 256 9431 77 | Droits d'auteur 2026 | Conditions générales | Politique de confidentialité

Génération
Numérique

Bureau au Royaume-Uni
33 rue Queen,
Londres
EC4R 1AP
Royaume-Uni

Bureau au Canada
1 University Ave,
Toronto,
ON M5J 1T1,
Canada

Bureau NAMER
77 Sands St,
Brooklyn,
NY 11201,
États-Unis

Bureau EMEA
Rue Charlemont, Saint Kevin's, Dublin,
D02 VN88,
Irlande

Bureau du Moyen-Orient
6994 Alsharq 3890,
An Narjis,
Riyad 13343,
Arabie Saoudite

UK Fast Growth Index UBS Logo
Financial Times FT 1000 Logo
Febe Growth 100 Logo (Background Removed)


Numéro d'entreprise : 256 9431 77
Conditions générales
Politique de confidentialité
Droit d'auteur 2026